Category: Site Visit

CE5309/4363 Prestressed Concrete (Spring 2016) – Dallas Horseshoe Project Post-Tensioned Bridge and VSL Plant Visit
May 11, 2016The purpose of the two visits was for students to see the hardware (post-tensioning devices, tendons, anchorages, etc. at VSL plant in Fort Worth, Texas) and…

CE5309/4363 Prestressed Concrete (Spring 2015) – State Farm Hub Phase II – Richardson, Texas
May 11, 2015Site visit (with both graduate and undergraduate students in my class, my graduate students, as well as engineers) to a reinforced concrete building with post-tensioning construction….

CE5309/4363 Prestressed Concrete (Spring 2014) – Precast Plant (ATESVI) Visit – Irving, Texas
May 11, 2014Site visit (with both graduate and undergraduate students in my class, my graduate students, as well as bridge design engineers) to a precast plant producing TxDOT…