The Computer labs will be closed for testing on May 18 and 19 for testing.
the closings are from 8A to 1P
The central library will be open for printing needs. The Student Success Center will be open during the closings as well.
The Computer labs will be closed for testing on May 18 and 19 for testing.
the closings are from 8A to 1P
The central library will be open for printing needs. The Student Success Center will be open during the closings as well.