SEIR Building – Partial Electrical Outage
OIT is installing a large-scale UPS in SEIR B50. Per Brad Samek, they have determined this will require electrical outages in the following areas of the building on Saturday, July 30th, beginning at 8:00 a.m. lasting no later than 2:00 p.m.: Sub-panel 1SBLA1 (in corridor 1C14) Power 155 (women’s restroom)…