Week of January 3, 2011

College Street Reopens

College Street re-opens to traffic Saturday, January 8th.  The street will be one way with traffic traveling southbound only.  The street has been resurfaced and striped to allow for ten visitor metered spaces and ten motorcycle spaces.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

First Street Converts Back To One Way Traffic

With College Street re-opening Saturday January 8th, 1st Street will convert back to one way traffic traveling eastbound only.  Traffic will no longer be allowed to turn right onto First Street at West Street.  With the traffic traveling east bound only, the drivers using the parking meters will return to exiting their vehicles onto the side walk and not into the flow of traffic.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Early Morning Concrete Pour

We have scheduled an early morning pour of the slab at Main Concourse #6 at the College Park Center site for Tuesday, January 4, 2010 at 1am. We will begin setting up equipment at 11:30 pm with the concrete arriving to the site beginning at 1 am. The concrete trucks will enter the site through Gate 3 off Center Street and exit the site through Gate 4 back onto Center Street. This 350cy pour should be completed prior to 7 am and is being made at night to minimize the congestion on-site between the concrete pump and tower cranes. Please pass this information on to all departments that need to be aware of this scheduled pour.

We will also pour the west practice court slab on Friday, January 7, 2010 at 1 am as well. Details of this concrete placement are to follow.