Week of August 23, 2010

Window Cleaning

We will have window cleaning taking place across campus at various buildings for the next 3 weeks. Cones and barricades will be around the contractors if they are in a walk way.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Parking Lots and West Street Improvements

•Lot 47 – Pavement, Lighting and sidewalk completed. Landscaping is being completed today.

•Lot 38 – Pavement, Fencing and Lighting completed. Greenbelt landscaping scheduled during September 2010.( will be mulched until then)

•Gates Installations at F-13 and Arlington Lot 39 completed, Mav Express will be operational and tested by 8/26/2010.

•West Street Bridge – Improvements and handrail modifications will be completed by 8/25/10.

•Lipscomb Hall Parking – Contractor has completed trenching and made pavement repairs. Parking spaces re-opened.

•West Street Bus Stop – Curb cut and bus stop re-location has been completed. Landscaping completed

•Bus Stops – Bus Stops for lot 56 and the St. Maria Lot are being modified expected installation TBD.

•Library ADA Parking – Project completed , Sign Shop is installing one additional sign (we gained one ADA space)

•Parking lot repairs in F-10, 30 and Lot 26 have been completed. Sign Shop painting the new bollards and equipment.

•Parking Meters – Oak Street meters have been installed (16) and all signage upgraded to reflect the new hours of operation.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Campus Signage

•Exterior Signage Parking Lots – Contractor is on campus today and Wednesday installing the new panel signage on all the parking lot entrances.

•Street Signage Upgrade – Contractor is on campus working with the Sign Shop on the replacement of out of code signage and addressing remaining damaged poles and bollards.

•Cooper Street Bridge Banners – Install scheduled to start tonight at 11:15 p.m. ( some minor painting will also be done)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Fine Arts Electrical Outage-RE-SCHEDULED TIME

Facilities Management has an electrical contractor working in the southwestern corner of the building addressing some electrical corrections and adding additional service to the area. The work will involve an electrical outage of just this area of the building. We had hoped to complete this project before classes, but couldn’t because of equipment shipping delays.

The outage is schedule for Saturday, September 4th and will only involve the Communications offices, classrooms and the old studio area on the 1st floor within this area. This outage will not affect Music, Theater or the Art Department.